380 Kv POWER LİNE | |||
EMPLOYER | PERFORMED WORKS | KM | DATE OF CONTRACT |
KALEHAN ENERJI | 380 KV BEYHAN TM-AŞAGI KALEKÖY TM-YUKARI KALEKÖY TM E.İ.H | 90 | 2014 |
KALEHAN ENERJI | 380 KV 1272 MCM AŞAĞIKALEKÖY HES TM – BATMAN II TM E.İ.HATTI | 145 | 2013… |
CENGİZ HOLDİNG | 380 KV 2X CENAL TES (BANDIRMA İÇDAŞ 2 ) E.İ.HATTI | 24,7 | 2013… |
CENGİZ HOLDİNG | 380 KV 2X CENAL TES LAPSEKİ 2 | 61,3 | 2013… |
CENGİZ HOLDİNG | 380 KV SÜTLÜCE (NT-GELİBOLU TM) E.İ. HATTI | 15 | 2013… |
CENGİZ HOLDİNG | 380 KV CENGİZ DGKÇ.S. TM (ÇARŞAMBA-ALTINKAYA) BRŞ.N E.İ. HATTI | 9,5 | 2013… |
AĞAOĞLU | 380 KV İZDEMİT TES TM-(ALİAĞA II-UZUNDERE) BRS.N E.İ.HATTI | 8,3 | 2012 |
BORASCO | 380 KV 3B 1272 MCM SAMSUN DGKÇS TM – (ÇARŞAMBA – TİREBOLU) BRŞ.N. (DR.97) E.İ.HATTI | 15 | 2010 |
BORASCO | 380 KV 3B 1272 MCM SAMSUN DGKÇS TM – (ÇARŞAMBA – TİREBOLU) BRŞ.N.(DR.66) E.İ.HATTI | 15 | 2010 |
RWE ENERJİ | 380 KV 2X3B 1272 MCM (AFYON II- DENIZLI IV TM) BRŞ.ND – DENİZLİ DGKÇS TM E.İ.HATTI | 11 | 2010 |
RWE ENERJİ | 380 KV 3B 1272 MCM DENİZLİ DGKÇS TM-DENİZLİ IV TM. E.İ.HATTI | 24 | 2010 |
EREN HOLDİNG | 380KV 1272 MCM ACSR EREN TES-OSMANCA TM E.İ.H | 67 | 2009 |
ENERJİSA | 380 KV 2X954 (KBİGA-BURSA) BRŞ.N. -ENERJİSA | 7 | 2009 |
EMTA A.Ş. | 380 KV ZETES TM – EREĞLİ II. TM | 55 | 2008 |
ÇOLAKOĞLU AŞ. | 380 KV. ÇOLAKOĞLU 154/380 TM-ÇOLAKOĞLU TM | 2 | 2008 |
İSDEMİR A.Ş. | 380 KV. ERZIN TM – İSDEMIR TM | 30 | 2005 |
ÇOLAKOĞLU AŞ. | 380 KV. TEPEÖREN-ÇOLAKOĞLU TM | 18 | 2005 |
HORASAN Joint V. | 380 KV HORASAN-AĞRI | 82 | 2004 |
BALFOUR BEATTY | 380 KV İYIDERE-BORÇKA | 130 | 2003 |
ÖZDİL AŞ. | 380 KV YUSUFELI-ERZURUM | 130 | 2003 |
ÖZDİL AŞ. | 380 KV BORÇKA-DERINER-YUSUFELI | 75 | 2003 |
MİTAŞ TAŞ. | 380 KV TIREBOLU-İYIDERE | 136 | 2003 |
GALKON AŞ. | 380 KV. ELBISTAN A-ELBISTAN B | 14 | 2002 |
GALKON AŞ. | 380 KV. Ş.URFA-KIZILTEPE | 161 | 2002 |
BARMEK A.Ş. | 380 KV. H.164 GRUP HATLAR | 117 | 2001 |
GALKON AŞ. | 380 KV. BULGARISTAN-HAMITABAT | 90 | 2000 |
ŞA-RA AŞ. | 380 KV. BIRECIK-G.ANTEP | 52 | 2000 |
MİTAŞ TAŞ. | 380 KV. İRAN SINIR-BAŞKALE | 51 | 2000 |
GALKON AŞ. | 380 KV. YEŞILHISAR-KONYA IV (1-163) | 68 | 2000 |
İÇDAŞ AŞ. | 380 KV. KARABIGA-BURSA DGKÇS | 175 | 2000 |
GALKON AŞ. | 380 KV. BOTAŞ GIRIŞ-ÇIKIŞ | 50 | 1999 |
MİTAŞ TAŞ. | 380 KV. BURSA-GEBZE | 60 | 1997 |
ÖZDİL AŞ. | 380 KV. YATAĞAN-DENIZLI | 120 | 1996 |
ÖZDİL AŞ. | 380 KV. ERZURUM-HORASAN | 100 | 1996 |
MİTAŞ TAŞ. | 380 KV. KEBAN-ÖZLÜCE | 152 | 1995 |
Emad Enerji Harita
Referans Listemiz
154 Kv POWER LİNE | |||
EMPLOYER | PERFORMED WORKS | KM | DATE OF CONTRACT |
TEİAŞ 21. BÖLGE MÜDÜRLÜĞÜ | 154 KV (SÖKE TM – GERMENCİK TM) BRŞ.N – SÖKE RES TM E.İ.HATTI KAMULAŞTIRMA ORMAN HARİTA PLANLARININ PROJELERİ | 2018 | |
TEİAŞ 20. BÖLGE MÜDÜRLÜĞÜ | 17D001120-47 PROJE NOLU 154 KV TEKİRDAĞ – MALKARA (YENİLEME) E.İ.HATLARI ETÜT, PLAN, PROFİL DİREK TEVZİATI ve DİREK APLİKASYONU PROJELERİ | 2018 | |
GREENECO ELEKTRİK ÜRETİM AŞ | GREENECO JES S TM – (KUYUCAK – KIZILDERE I ) BRŞ.N E.İ. HATTI GREENECO JES TM – AGE DGKÇ TM E.İ.HATTI ETÜD PROJE KAMULAŞTIRMA PROJELERİ | 2018 | |
LİMAK İNŞAAT | 380 KV 954 MCM ÇETİN HES TM SİİRT TM E.İ.HATTI PROJESİ | 2018 | |
LİMAK İNŞAAT | 154 KV GÜRSÖĞÜT 1 HES – GÜRSÖĞÜT 1 HES TM E.İ.H ve 154 KV GÜRSÖĞÜT 1 HES TM – KARGI HES TM E.İ.H PROJELERİ | 2018 | |
TATLIPINAR ENERJİ AŞ | 154 KV TATLIPINAR RES TM – BALIKESİR OSB TM E.İ.HATTI ETÜD KAMULAŞTIRMA PROJELERİ | 2018 | |
EGESİM EERJİ | 154 Kv 2×1272 MCM(GERMENCİK – SÖKE) BRŞ.N – KUBİLAY JES E.İ.HATTI ETÜT KAMULAŞTIRMA PROJELERİ | 2017 | |
ROK ENERJİ | 154/11 KV KUYUCAK RES TM E.İ.HATTI ETÜD KAMULAŞTIRMA PROJELERİ | 2017 | |
DSİ 3. BÖLGE ESKİŞEHİR | BALLIKAYA BARAJI ENERJİ NAKİL HATTI DEPLASESİ APLİKASYON MÜSTENİT PROJE ÇALIŞMASI | 2016 | |
SİS ENERJİ | 154 KV ÖZMEN I HES – ZORLU ALAŞEHİR JES TM E.İ.HATTI PLAN PROFİL AYAK KESİTİ PROJE HAZIRLANA İŞİ | 2016 | |
LİMAK | 154 KV KİLİS TM – LİMAK ÇİMENTO KİLİS TM E.İ.H ETÜT, PLAN, PROFİL PROJE İŞLERİ | 2016 | |
BERGRES ELEKTRİK | BERGRES 154 KV ENERİ İLETİM HATTI ETÜD – AYAK KESİTİ – KAMULAŞTIRMA PROJE YAPIMI İŞLERİ | 2016 | |
DATEL TELLİOĞLU | 154 KV 1272 MCM KINIK RES TM – ALİAĞA RES TM E.İ.HATTI KAMULAŞTIRMA ve ORMAN İZİN PROJE HAZIRLANMASI İŞİ | 2016 | |
BORARES ENERJİ | 154 KV 2×1272 MCM (BODRUM TM – YENİKÖY TM) BRŞ.N – KAROVA RES TM E.İ.HATTI | 2015 | |
DATEL TELLİOĞLU | 154 kv 1272 MCM KINIK RES TM ALİAĞA RES TM E.İ.HATTI ETÜD ve TEVZİAT AYAK KESİTİ PROJESİ | 2015 | |
KAVRAM ENERJİ | 154 KV 1272(ÇAYSEKA – KEÇİBORLU TM) E.İ.HATTININ GÖLOVASI TM – KEÇİBORLU TM KISMINDAN) BRŞ.N – ULUBORLU RES TM E.İ.HATTI | 2015 | |
TEİAŞ DENİZLİ BÖLGE MD | 154 KV 1272 MCM GERMENCİK – ASLANLAR (YENİLEME)E.İ.HATTI DİREK 8 ARASI KAMULAŞTIRMA PLANLARININ YAPILMASI İŞİ | 1 | 2014 |
BAĞLAR ELK. ÜRET.A.Ş | 154 KV KONYA 2-KONYA 3 TM E.İ.HATTI | 9,5 | 2013 |
GERSELK. ÜRET.A.Ş | 154 KV (SAYALAR-AKHİSAR) BRŞ.N-GERES RES TM | 6,5 | 2013 |
YEŞİLYURT | 154 KV DGKÇ.S. TM-(SAMSUN I-SAMSUN III) BRŞ.N E.İ.HATTI | 6 | 2012 |
EMTA | 154 KV YENİDERE TM-AMASYA RES TM E.İ.HATTI | 12 | 2012 |
STEAG | 154 KV SÜLOĞLU RES TM-EDİÇİM TM E.İ.HATTI | 20 | 2012 |
İMGE HARİTA | 154 KV 477 MCM İLETKENLİ MUĞLA DALAMAN ENERJİ E.İ.HATTI | 40 | 2012 |
ENERJİSA | 154 KV YAMANLI 2-YAMANLI 3 HES TM | 37 | 2011 |
AĞAOĞLU | 154 KV 1272 MCM İLETKENLİ ŞAH RES TM – GÖBEL TM. E.İ.HATTI | 42 | 2010 |
ENERJİSA | 154 KV 1272 MCM KÖPRÜ HES TM – MENGE HES TM-FEKE TM. E.İ.HATTI | 74 | 2010 |
LİMAK | 154 KV 2X 954 MCM ALKUMRU HES TM – SİİRT TM E.İ.HATTI | 22 | 2008 |
LİMAK | 154 KV 2X954 MCM ALKUMRU HES TM.-SİİRT ÇİM TM. EİH | 39 | 2008 |
DOĞAL ENERJİ A.Ş. | 154 KV SAYALAR RES-AKHISAR TM | 31 | 2006 |
TEİAŞ Gn Md. | 154 KV. ÇORUM, FETHIYE GRUBU | 74 | 2005 |
CAMİŞ A.Ş. | 154 KV. ŞIŞECAM-MERSIN II TM | 27 | 2005 |
GALKON AŞ. | 154 KV. BRŞ.N- G.ANTEP IV | 12 | 2002 |
ŞA-RA AŞ. | 154 KV. AFYON – UŞAK | 125 | 2001 |
ŞA-RA AŞ. | 154 KV. TEKNECIK-LEFKOŞE | 20 | 2000 |
GALKON AŞ. | 154 KV. BATMAN-ILISU-CIZRE | 120 | 2000 |
GALKON AŞ. | 154 KV. ŞARKIKARAAĞAÇ-AKŞEHIR | 29 | 2000 |
ÖZDİL AŞ. | 154 KV. KARKAMIŞ-SURUÇ | 42 | 1999 |
154 Kv POWER LİNE | |||
EMPLOYER | PERFORMED WORKS | KM | DATE OF CONTRACT |
ÖZDİL AŞ. | 154 KV. KARKAMIŞ-BIRECIK | 21 | 1999 |
NATO ENF. | 154 KV. SABIHA GÖKCEN HAVAALANI | 9 | 1999 |
ENMON LTD. ŞTİ. | 154 KV. DENIZLI-ACIPAYAM | 52 | 1998 |
AK-PE LTD. ŞTİ. | 154 KV. YEŞILHISAR-SENDIREMEKE | 42 | 1998 |
ÖZDİL AŞ. | 154 KV. YEŞILHISAR-NIĞDE | 46 | 1998 |
ŞA-RA AŞ. | 154 KV. BALIKESIR II-ÇAN | 100 | 1998 |
MİTAŞ TAŞ. | 154 KV. İST. GRUBU | 44 | 1997 |
MİTAŞ TAŞ. | 154 KV. SURUÇ-AKÇAKALE | 72 | 1993 |
OVERSEAS WORKS | |||
EMPLOYER | PERFORMED WORKS | KM | DATE OF CONTRACT |
MİTAŞ IRAK | 132 KV SOREN – REZAN-ERBIL – KHABAT-SHAQLAWA – MAHMUR-KASHE DOHUK POWER PLANT – DOHUK CENTER-KALACHI_BARDARASH-SEYIDSADIQ-HALAPJA-PENCWEEN | 965 | 2012 |
MİTAŞ LİBYA | 400 KV AJDABYA TM – SARIR TM | 60 | 2013 |
AFGANISTAN | 110 KV KABUL_PULALAM LINE | 110 | 2012 |
GURCİSTAN | 110_KV _TRANSMİSSİON_LINE_DARIALI_GUDAURI_MLETA | 95 | 2012 |
LOTUS TURKMENISTAN | 220 KV PELWERT-ATAMURAT HATTI | 121 | 2011 |
LOTUS TURKMENISTAN | 220 KV FARAP-SERDAR GÜZERGAHI HATTI | 84 | 2011 |
LOTUS TURKMENISTAN | 220 KV FARAP-WATAN HATTI | 263 | 2011 |
LOTUS TURKMENISTAN | 500 KV ATAMURAT-ANDHOY | 62 | 2011 |
LOTUS TURKMENISTAN | 500 KV ATAMURAT-MARY | 390 | 2011 |
MİTAŞ LİBYA | 400 KV SEBHA TM – GAMRA 1 TM | 242 | 2010 |
MİTAŞ LİBYA | 401 KV SEBHA TM – GAMRA 1 TM (VARYANT ÇALIŞMASI) | 17 | 2010 |
MİTAŞ LİBYA | 400 KV SIRTE TM – HOUN TM-PART1 | 183 | 2010 |
MİTAŞ LİBYA | 400 KV SIRTE TM – HOUN TM-PART2 | 105 | 2010 |
MİTAŞ LİBYA | 400 KV SIRTE TM – MISRATA TM | 157 | 2010 |
MİTAŞ LİBYA | 220_KV 16_BIRALALEMCONNECTION %70 TAMAMLANDI. | 4 | 2010 |
MİTAŞ LİBYA | 220 KV OVERHEAD S/S TRIPOLI EAST – S/S ABU ARGUB | 2 | 2010 |
MİTAŞ LİBYA | 220 KV OVERHEAD TARHUNA – S/S ABU ARGUB | 2 | 2010 |
MİTAŞ LİBYA | 220 KV OVERHEAD S/S WADY AL HERA – S/S ABU ARGUB | 2 | 2010 |
MİTAŞ LİBYA | 1-EAST_WADIGHANCONNECTION | 25 | 2010 |
MİTAŞ LİBYA | 2-WEST_WADIGHANCONNECTION | 24 | 2010 |
MİTAŞ LİBYA | 220_KV 22_AGARUBRA_UBARI | 111 | 2010 |
MİTAŞ LİBYA | 66_KV 2_ABUKHAMASH_ALASSA | 27 | 2010 |
MİTAŞ LİBYA | 66_KV 3_GOTHBEYUD_AGELAT | 6 | 2010 |
MİTAŞ LİBYA | 66_KV 4_GOTHBEYUD_ALNAHDA | 5 | 2010 |
MİTAŞ LİBYA | 66_KV 5_BIRSARDIENCONNECTION | 11 | 2010 |
MİTAŞ LİBYA | 66_KV 6_QARIASAKANIA_BENJAWAD | 48 | 2010 |
MİTAŞ LİBYA | 66_KV 7_GIAREF_SIIRTPOWERPLANT | 8 | 2010 |
MİTAŞ LİBYA | 1-EAST_LINE | 16 | 2010 |
MİTAŞ LİBYA | 2-WEST_LINE | 16 | 2010 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) WEST SULY S/S – RIZGARI S/S | 3 | 2008 |
MİTAŞ IRAK | 132 KV D.C. TASLUJA/CHAMCHAMAL – ZARGATA S/S | 1 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) AZMAR S/S – ZARGATA S/S | 5 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) CONNECTION SOUTH SULY S/S – CONNECTION ╦ RIZGARI-AZMAR RING | 3 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) AZMAR S/S – RIZGARI S/S RING | 14 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) CONNECTION ╦ AZMAR – ZARGATA – TOWER NO. 57 | 39 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) CHAMCHAMAL P/S – WEST SULY S/S | 52 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) CHAMCHAMAL P/S – SOUTH SULY. S/S | 71 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) SOUTH SULY S/S – CONNECTION ╦ DARBAMDIKHAN- RIZGARI/AZMAR | 2 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) CHAMCHAMAL P/S – WEST SULY S/S & RIZGARI S/S ╦ CONNECTION | 52 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) WEST SULY S/S – RIZGARI S/S (STAGE 1) | 3 | 2008 |
MİTAŞ IRAK | 132 KV D.C. (TWIN TEAL) REROUTING EXISTING TASLUJA – CHAMCHAMAL | 6 | 2008 |
MİTAŞ LİBYA | 400 KV S/S RUWAYS – S/S GHADAMES | 119 | 2007 |
MİTAŞ LİBYA | 400 KV AL KHUMS-MISURATA | 139 | 2007 |
MİTAŞ LİBYA | 400 KV TRIPOLI WEST-SOUT | 41 | 2007 |